Archbishop New Classrooms | Liverpool
Client: Archbishop Blanch
Completed in 2024, this £1.7 million extension at Archbishop Blanch CE High School was commissioned to address rising student numbers.
The new two-storey block delivers six modern classrooms, offering flexible learning spaces that can adapt to the school’s evolving needs.
The design is thoughtfully integrated with the existing site, featuring a covered corridor that ensures seamless connectivity between the new and old structures. Beyond providing vital extra capacity, the building is designed for dual use, offering secure and accessible facilities that benefit both the students and the wider local community.