Beddington Lane | Croydon
Client: Viridor
Beddington Lane Energy from Waste facility located west of Croydon in SW London, was delivered through stages 4 and 5 for Viridor processing circa 360,000 tonnes of waste per annum.
The twin line facility occupies a small corner of a previous extensive landfill waste management operation that is now being transformed into a wildlife park for community use.
The site delivery for the project needed to maintain existing waste disposal operations during the full construction period until operations could be transferred to the new facility.